Description
The house was almost fully gutted to allow for a complete remodeling of the entire home, with the exception of two bedrooms.
Built large addition at rear of house along with a new deck and trellis.
Relocated the front entry from the second floor to the first floor with an addition.
Built a large kitchen, master suite, three unique bathrooms, and a custom sauna.
Made four large cedar decks with horizontal steel cable railings.